Pre-Restoration Checklist for Industrial Ball Mills
What to Do:
- Inspect Components Thoroughly:
- Check for wear in liners, grinding media, and diaphragms
- Examine the girth gear, pinion, and bearings for cracks or misalignment
- Clean the System:
- Remove residual RHA and debris using compressed air systems
- Vacuum clean classifiers and conveyors to prevent contamination
- Verify Lubrication Systems:
- Replace old grease with ISO VG 320 oil for gear lubrication
- Test automatic lubrication system functionality
What NOT to Do:
- ❌ Avoid Skipping Inspections: Minor gear cracks can lead to catastrophic failure
- ❌ Don't Use Incorrect Lubricants: Non-food-grade grease degrades RHA quality
- ❌ Never Bypass Safety Protocols: Always implement lock out/tag out procedures
Post-Restoration: Girth Gear Alignment Process
- Radial Runout Measurement: Use dial indicators (tolerance ≤0.2 mm/m)
- Pinion Adjustment: Maintain 1.5-2 mm backlash between pinion and gear
- Thermal Compensation: Conduct alignment at 60-70°C operating temperature
Expert Tip: Apply lithium-based high-pressure grease during startup
Common Alignment Mistakes:
- Over-tightening gear bolts causing distortion
- Ignoring thermal expansion during measurements
Auxiliary Equipment Maintenance Guide
1. Classifiers
- Do: Weekly rotor blade cleaning for 45-100 micron particle size
- Don't: Operate with imbalanced rotors (reduces efficiency by 40%)
2. Screw Conveyors
- Do: Monthly trough inspections with UHMW-PE liners
- Don't: Exceed 85% load capacity to prevent motor failure
3. Bucket Elevators
- Do: Bi-weekly belt tension checks (recommended 1-2% elongation)
- Don't: Ignore spillage indicating incorrect bucket spacing